Core Solution & System Integration
Facing challenges with no precedent to follow, our company, as the core equipment and system integration supplier, provided the first complete set of localized barge bunkering station solutions covering the entire process of receiving, storage, processing, bunkering, and recovery. We accomplished the coordinated design and integration of key main equipment with a high-standard, integrated philosophy.
- Full Set of Main Equipment Integration & Functional Innovation:
- Shore-Based Unloading Skid: Enabled safe and efficient connection and transfer from the transport vessel to the barge storage tanks, ensuring the start of the waterborne bunkering chain.
- Dual 250m³ Large Storage Tanks: Provided substantial LNG storage capacity, guaranteeing the station's continuous operation and supply stability.
- Dual Bunkering Arm System: Allowed for efficient and flexible vessel fuel bunkering, enhancing operational efficiency and service capability.
- BOG Recovery Installation: A key component reflecting technological advancement and environmental friendliness. It effectively solved the challenge of recovering and handling boil-off gas during storage on the barge, achieving zero-emission operation and preventing energy waste.
- Integrated Control System: Acting as the "brain," it integrated individual equipment units into an intelligent, coordinated whole, enabling fully automated monitoring and safety interlock management for the entire station.
- Foundational Role in Standardization & Safety:
- From the initial design phase, it was deeply aligned with CCS regulations. Its successful certification process itself established a clear path for plan approval, inspection, and certification for subsequent similar projects. The selection, layout, and installation of all equipment prioritized compliance with the highest maritime safety standards, setting an industry safety benchmark.
Post time: Sep-19-2022